This installation guide is design to assist you and covers all aspects in the installation GLW Oil Purifiner System. Should at any point that you have any enquiries or questions regarding the installation guide, please feel free to contact us or your nearest GLW dealer for technical assistance.

Things To Note Before Installation →

Tools Required For Installation

1) Drill and assorted drill bits

2) Thread seal tape or equivalent sealant

3) Open-end wrench assortment (9mm, 11mm, 12mm, 13mm, 14mm, 16mm, 17mm, 22mm)

4) Large, adjustable crescent wrench

5) Cutting, crimping and wire-stripping pliers

6) Electric cut-off wheels

7) Sharp knife

8) Hammer and center punch

9) Voltmeter or test pen

10) Necessary fittings to make return hose connection to engine

11) 3/16’’ I.D. high pressure hose

12) 3/ 4’’ I.D. return hose

13) New full-flow OEM filter

14) New lubrication oil (Recommended By Manufacturer)

 

Installation Checklist

1) Check parts list against parts received.

2) Call the supplier if any parts are missing or damaged.

3) Survey application for the mounting location.

4) Check return hose requirements.

5) Check pressure line requirements.

6) Check filter removal requirements.

7) Mount the unit at the chosen location.

8) Take an oil sample of the old oil to use as reference of the current engine condition.

9) Drain oil and install new full-flow filter.

10) Install return hose.

11) Fill crankcase with new oil and take sample of new oil for baseline comparison.

12) Install pressure line. If pressure is above 5 bar at normal operating temperature, install High-Pressure Metering Jet (included in the kit), or install optional pressure reducing valve.

13) Install heating element/electrical connections.

14) Attach clear vapour tube to the valve.

15) Start the engine and check for oil leaks.

16) Let engine run for 15-45 minutes and check the flow meter for oil flow. Oil level should be between the H and L indicator on the Sight Glass.

17) Shut down engine and check oil level. Add oil if needed.

 

FS System Packing List

This is the standard packing list of items that comes with every FS system.

 

PART # PART NAME DESCRIPTION QTY
1 ST-11 Br Needle Valve FLARE 7/16" SAE X ANGLE 1/4"-1/8 PT 1
2 ST-12 Br Barb 1/2" BSP X 3/4" BARB 1
3 ST-13 Br Elbow 90º M 1/8" NTP -F 1/8" NPT 1
4 ST-14 Br Elbow 45º M 1/8" NPT -F 1/8" NPT 1
5 ST-15 Br Run Tee M 1/8" NPT -F 1/8" NPT -F 1/8" NPT 1
6 ST-17 Br Hose Fitting 1/4" JIC 2
7 ST-18 Br Adaptor 1/4" JIC X 1/8" BSP 1
8 ST-19 Br Hex Bushing 1/4" -1/8" NPT 1
9 ST-20 Br Non Return Val. F/F 1/8" 1
10 ST-21 Hex Nipple M 1/8"NPT x  M 1/8"NPT 1
11 ST-22 Water Hose 3/16" x 300mm 1
12 FI-55 Br Metering Jet 1/8 BSP x Ø 0.4mm 1

 

PART # PART NAME DESCRIPTION QTY
1 ST-23 WIRE Grade 70 x 3M 1
2 ST-24 FUSE HOLDER MINI -FOR 14V 1
3 ST-25 MINI FUSE MINI 15A 1
4 ST-36 CABLE TIE 10" 5

 

PART # PART NAME DESCRIPTION QTY
1 HEX SCREW M8 X 35mm(GALVANIZE) 8.8 2
2 HEX SCREW M8 X 25mm(GALVANIZE) 8.8 2
3 LOCK NUT M8 NYLON(GALVANIZE) 4
4 FLAT WASHER M8 (GALVANIZE) 8

 

STANDARD PACKING LIST--FS50
CODE PART NAME DESCRIPTION QTY
1 EV FS50 Evaporator Head - 1
2 HC-1 Heater Cover - 1
3 Cap Screw M4 x 10 2
4 BFS50MS Bracket(1 Set) ID 111 x T 50mm 1
5 VV-002 Vapour Valve(1 SET) - 1
6 CFS50MS OP Canister OD 111 x H 136.5mm 1
7 CH75W12-45 Cartridge Heater Ø 19mm x 45mm x 12V x 75W 1
8 BRMJ2-0.8 Br Metering Jet 1/8"BSP X HOLEØ0.8 1
9 FGFS400MS Flow Gauge 1 Set
10 Jam Nut M24 1
11 Standard Fitting 1 Bag 1
12 User Manual 1